The Foxconn Con with Josh Dzieza

35:43
 
Share
 

Manage episode 281124142 series 2300744
By NBCNews, Chris Hayes, MSNBC, and NBCNews THINK. Discovered by Player FM and our community — copyright is owned by the publisher, not Player FM, and audio is streamed directly from their servers. Hit the Subscribe button to track updates in Player FM, or paste the feed URL into other podcast apps.

In June 2018 Donald Trump posed with then Wisconsin Governor Scott Walker and Foxconn Chairman Terry Gou at a ground breaking ceremony for the new Foxconn facility in Mt. Pleasant, Wisconsin. Touted as “the eighth wonder of the world” by the president, the multi-billion dollar deal was supposed to produce a 20-million-square-foot manufacturing complex, thousands of jobs, and the beginning of a new well-paying manufacturing sector in the American Midwest. Over two years later, almost none of that has happened. Instead of thousands of new jobs and a promising facility, Wisconsin looks to have been left holding the bag on a deal that was over promised and under delivered. This week, investigations editor and feature writer at The Verge, Josh Dzieza, joins to talk about what happened with the Wisconsin-Foxconn deal and why its promise was doomed to fail.

The Eighth Wonder of the World by Josh Dzieza

Foxconn tells Wisconsin it never promised to build an LCD factory by Josh Dzieza

209 episodes