Content provided by Froude Dyno. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Froude Dyno or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Commissioning a Dynamometer

21:53
 
Share
 

Manage episode 412994619 series 3472705
Content provided by Froude Dyno. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Froude Dyno or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Welcome to another episode of "dyno INSITES" presented by Froude. In this episode, Chris and Mike discuss the crucial process of commissioning a dynamometer. The conversation covers the reasons behind commissioning, emphasizing the need to validate equipment in its working environment to ensure proper integration and functionality.

They delve into the preparations required before commissioning, highlighting the importance of facility requirements, correct installation, and alignment of the dynamometer, engine, and driveline. Alignment, regardless of the engine's speed, is deemed critical for data accuracy and the smooth operation of the dyno.

The discussion also touches on the role of the commissioning engineer and the collaboration between the supplier and the customer during the commissioning phase. They stress the significance of communication and having a single point of contact at the customer site to streamline the process.

The hosts explore potential challenges during the pre-commissioning stage, emphasizing the need for thorough preparation and the resolution of any issues before the commissioning engineer arrives. They share insights into the complexities of safety considerations, particularly the emergency stop (E-stop) strategy, which is crucial in case of unforeseen circumstances.

Chris and Mike underscore the importance of a known test engine with a documented history to facilitate accurate commissioning and troubleshooting. They discuss the involvement of the customer's engineering team, highlighting the value of their expertise in understanding their specific product and the commissioning engineer's role in recognizing potential issues to ensure a dynamic and safe testing environment.

For more insights into engine testing and dynamometer systems, stay tuned for future episodes of "dyno INSITES."

Thank you for listening! If there's an engine testing topic you'd like us to cover in future episodes, or you'd like to be a guest on dyno INSITES, please email podcast@froudedyno.com.
Visit Froude's website for more information on dynamometer test systems.

  continue reading

28 episodes

Artwork
iconShare
 
Manage episode 412994619 series 3472705
Content provided by Froude Dyno. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Froude Dyno or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Welcome to another episode of "dyno INSITES" presented by Froude. In this episode, Chris and Mike discuss the crucial process of commissioning a dynamometer. The conversation covers the reasons behind commissioning, emphasizing the need to validate equipment in its working environment to ensure proper integration and functionality.

They delve into the preparations required before commissioning, highlighting the importance of facility requirements, correct installation, and alignment of the dynamometer, engine, and driveline. Alignment, regardless of the engine's speed, is deemed critical for data accuracy and the smooth operation of the dyno.

The discussion also touches on the role of the commissioning engineer and the collaboration between the supplier and the customer during the commissioning phase. They stress the significance of communication and having a single point of contact at the customer site to streamline the process.

The hosts explore potential challenges during the pre-commissioning stage, emphasizing the need for thorough preparation and the resolution of any issues before the commissioning engineer arrives. They share insights into the complexities of safety considerations, particularly the emergency stop (E-stop) strategy, which is crucial in case of unforeseen circumstances.

Chris and Mike underscore the importance of a known test engine with a documented history to facilitate accurate commissioning and troubleshooting. They discuss the involvement of the customer's engineering team, highlighting the value of their expertise in understanding their specific product and the commissioning engineer's role in recognizing potential issues to ensure a dynamic and safe testing environment.

For more insights into engine testing and dynamometer systems, stay tuned for future episodes of "dyno INSITES."

Thank you for listening! If there's an engine testing topic you'd like us to cover in future episodes, or you'd like to be a guest on dyno INSITES, please email podcast@froudedyno.com.
Visit Froude's website for more information on dynamometer test systems.

  continue reading

28 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide