Content provided by Brian Moorhead. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Brian Moorhead or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Transmission Capacity Crunch - Renewables & Battery Storage: Part 1

32:04
 
Share
 

Manage episode 358133885 series 3316286
Content provided by Brian Moorhead. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Brian Moorhead or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

With all new #Renewable and #BatteryStorage projects in GB being quoted connection dates of 2028-2038 and beyond due to Transmission Capacity Issues, Brian and David delve into the challenges driving this.

One episode wouldn’t cut it as this is probably the biggest topic in Renewable or BESS Development right now, so we’ll be stepping through the issue in a ‘Transmission Capacity Crunch’ Mini-series.

Part 1 is available now, which sets the scene by covering some background on the GB Transmission Network and its interaction with Distribution Networks, the volumes of connection applications, our 2030 & 2050 capacity targets and some of the key challenges being faced by the Grid.

In the following episodes, we’ll be getting into the challenges and solutions in more detail, along with a summary of our thoughts on what Renewable or BESS Developers & Investors should be considering.

Like or subscribe to stay tuned.

  continue reading

21 episodes

Artwork
iconShare
 
Manage episode 358133885 series 3316286
Content provided by Brian Moorhead. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Brian Moorhead or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

With all new #Renewable and #BatteryStorage projects in GB being quoted connection dates of 2028-2038 and beyond due to Transmission Capacity Issues, Brian and David delve into the challenges driving this.

One episode wouldn’t cut it as this is probably the biggest topic in Renewable or BESS Development right now, so we’ll be stepping through the issue in a ‘Transmission Capacity Crunch’ Mini-series.

Part 1 is available now, which sets the scene by covering some background on the GB Transmission Network and its interaction with Distribution Networks, the volumes of connection applications, our 2030 & 2050 capacity targets and some of the key challenges being faced by the Grid.

In the following episodes, we’ll be getting into the challenges and solutions in more detail, along with a summary of our thoughts on what Renewable or BESS Developers & Investors should be considering.

Like or subscribe to stay tuned.

  continue reading

21 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide