Artwork

Content provided by Brian Moorhead. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Brian Moorhead or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Capacity Crunch Update: State of Play in May 2024

18:04
 
Share
 

Manage episode 421307074 series 3316286
Content provided by Brian Moorhead. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Brian Moorhead or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Brian Moorhead & David McDonald talk you through the major changes that are just around the corner for grid connections in the UK.

For anyone with export capacity connections in the queue (connection offer accepted): we strongly recommend starting to do your homework for the recent Distribution and Transmission Networks Operators joint call to action.

All projects are required to provide information on planning status and land rights for all export capacity grid connections (some DNOs have specified >1MW only, we recommend you clarify this if <1MW).

Responding on time with the right information could be the difference between having 15 years added to your connection date, or having it accelerated. Export capacity for all accepted offers in the current queue is at risk.

➡️ Listen Now:

Spotify: https://ow.ly/ookr50S3LuM

Apple Podcast: https://ow.ly/AFvy50S3LuP

YouTube: https://ow.ly/AtXZ50S3LuU

Web Player: https://ow.ly/RARB50S3LuV

Like and subscribe to stay tuned.

Follow us on our social media channels:

LinkedIn: https://www.linkedin.com/company/esmartnetworks

Instagram: https://www.instagram.com/esmartnetworks

Twitter: https://twitter.com/esmartnetworks1

Facebook: https://www.facebook.com/eSmartNetworks

  continue reading

21 episodes

Artwork
iconShare
 
Manage episode 421307074 series 3316286
Content provided by Brian Moorhead. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Brian Moorhead or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Brian Moorhead & David McDonald talk you through the major changes that are just around the corner for grid connections in the UK.

For anyone with export capacity connections in the queue (connection offer accepted): we strongly recommend starting to do your homework for the recent Distribution and Transmission Networks Operators joint call to action.

All projects are required to provide information on planning status and land rights for all export capacity grid connections (some DNOs have specified >1MW only, we recommend you clarify this if <1MW).

Responding on time with the right information could be the difference between having 15 years added to your connection date, or having it accelerated. Export capacity for all accepted offers in the current queue is at risk.

➡️ Listen Now:

Spotify: https://ow.ly/ookr50S3LuM

Apple Podcast: https://ow.ly/AFvy50S3LuP

YouTube: https://ow.ly/AtXZ50S3LuU

Web Player: https://ow.ly/RARB50S3LuV

Like and subscribe to stay tuned.

Follow us on our social media channels:

LinkedIn: https://www.linkedin.com/company/esmartnetworks

Instagram: https://www.instagram.com/esmartnetworks

Twitter: https://twitter.com/esmartnetworks1

Facebook: https://www.facebook.com/eSmartNetworks

  continue reading

21 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide