Artwork

Content provided by Acadia Broadcasting Corporation, Don Mills, and David Campbell. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Acadia Broadcasting Corporation, Don Mills, and David Campbell or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Episode Two (Forest Sector): How Can Mass Timber Impact the Housing Shortage?

58:16
 
Share
 

Manage episode 375667677 series 2903830
Content provided by Acadia Broadcasting Corporation, Don Mills, and David Campbell. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Acadia Broadcasting Corporation, Don Mills, and David Campbell or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Mass Timber Can Shorten Construction Times Significantly

In this episode of the Insights Podcast , we examine a new initiative under development to build the first mass timber manufacturing plant in Atlantic Canada, led by Patrick Crabbe, the President & CEO of the Mass Timber Company and also the Director of Mass Timber for Bird Construction. Mass timber can be used to replace concrete and steel in the construction of residential and commercial buildings. There are already mass timber buildings being built in the region. The company plans to build a manufacturing facility that will cost nearly $180 million and produce fifty thousand square cubic feet of mass timber, enough to construct more than 3,000 housing units per year once full production capacity is achieved. Mass timber, because it is manufactured off-site, has the advantage of shortening construction time by as much as 30 percent which translates into lower overall construction costs for developers, as well as lowering CO2 emissions by 45 percent. The company is working with two local sawmills, Elmsdale Lumber and Ledwidge Lumber, as their source of wood supply, which will create higher value end products for these sawmills. Construction is expected to start in mid-2024 and be completed in the fall of 2026. This is the second in a new series on the Forest Industry in Atlantic Canada.

  continue reading

174 episodes

Artwork
iconShare
 
Manage episode 375667677 series 2903830
Content provided by Acadia Broadcasting Corporation, Don Mills, and David Campbell. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Acadia Broadcasting Corporation, Don Mills, and David Campbell or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Mass Timber Can Shorten Construction Times Significantly

In this episode of the Insights Podcast , we examine a new initiative under development to build the first mass timber manufacturing plant in Atlantic Canada, led by Patrick Crabbe, the President & CEO of the Mass Timber Company and also the Director of Mass Timber for Bird Construction. Mass timber can be used to replace concrete and steel in the construction of residential and commercial buildings. There are already mass timber buildings being built in the region. The company plans to build a manufacturing facility that will cost nearly $180 million and produce fifty thousand square cubic feet of mass timber, enough to construct more than 3,000 housing units per year once full production capacity is achieved. Mass timber, because it is manufactured off-site, has the advantage of shortening construction time by as much as 30 percent which translates into lower overall construction costs for developers, as well as lowering CO2 emissions by 45 percent. The company is working with two local sawmills, Elmsdale Lumber and Ledwidge Lumber, as their source of wood supply, which will create higher value end products for these sawmills. Construction is expected to start in mid-2024 and be completed in the fall of 2026. This is the second in a new series on the Forest Industry in Atlantic Canada.

  continue reading

174 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide