Go offline with the Player FM app!
Arizona Sonoran's Inclusion of MainSpring Property Boosts Copper Production with New PEA
Manage episode 433837149 series 2410049
Arizona Sonoran Copper has published a new preliminary economic assessment (PEA) for its Cactus project, which has received positive feedback from the market. The inclusion of the MainSpring property in the mine plan has improved the economics of the project, with an NPV(8) after-tax of over $2 billion and an IRR after-tax of 24%. The project is expected to have a 31-year operating life and produce an average of 86,000 short tons of cathode production per annum. Arizona Sonoran Copper is outperforming its peers in terms of key performance indicators, despite having a lower market cap.
3150 episodes
Manage episode 433837149 series 2410049
Arizona Sonoran Copper has published a new preliminary economic assessment (PEA) for its Cactus project, which has received positive feedback from the market. The inclusion of the MainSpring property in the mine plan has improved the economics of the project, with an NPV(8) after-tax of over $2 billion and an IRR after-tax of 24%. The project is expected to have a 31-year operating life and produce an average of 86,000 short tons of cathode production per annum. Arizona Sonoran Copper is outperforming its peers in terms of key performance indicators, despite having a lower market cap.
3150 episodes
All episodes
×Welcome to Player FM!
Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.