Artwork

Content provided by Jason Hoevelmann. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Jason Hoevelmann or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Company Planning at Buildings

21:16
 
Share
 

Manage episode 155716902 series 1166151
Content provided by Jason Hoevelmann. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Jason Hoevelmann or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Weekly Company Drill

Building Familiarization

This drill is a size up and familiarization drill. It can be broken up into several parts and get as much information gathered as possible.

The objective of this drill is to identify specific hose length stretches for large complexes or buildings that may test the ability of your typical 150' or 200' pre-connect hose line. Share your information with the other companies.

Instructions

Gather some utility or search rope. We use three, 100 foot sections of 9mm search rope in a bag. Park where you would normally park if there were an incident. Tie off at the truck and stretch to the most remote area you can access. We tie off knots every 25 feet to help us figure out how far we are. Document distances going up stairs, over hand rails, special considerations, etc. Stretch to the back simulating a large blitz line.

Special Considerations

  • Access issues for apparatus
  • Water supply location and challenges
  • Forcible Entry
  • Floor plan challenges
  • Rear and remote access points
  • Utilities
  • Friction loss and flow rates
  • Ventilation considerations
  • Occupancy type and demographics
  • First due resources
  • Construction type and associated challenges
  • Proficiency with deployment of dead or static loads
  • Get the permission of the property owner

Special note: If we cannot get into an apartment, we take the distance to the front door of the apartment and then measure the full length of the apartment from the exterior, approximating the interior stretch.

  continue reading

50 episodes

Artwork
iconShare
 
Manage episode 155716902 series 1166151
Content provided by Jason Hoevelmann. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Jason Hoevelmann or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

Weekly Company Drill

Building Familiarization

This drill is a size up and familiarization drill. It can be broken up into several parts and get as much information gathered as possible.

The objective of this drill is to identify specific hose length stretches for large complexes or buildings that may test the ability of your typical 150' or 200' pre-connect hose line. Share your information with the other companies.

Instructions

Gather some utility or search rope. We use three, 100 foot sections of 9mm search rope in a bag. Park where you would normally park if there were an incident. Tie off at the truck and stretch to the most remote area you can access. We tie off knots every 25 feet to help us figure out how far we are. Document distances going up stairs, over hand rails, special considerations, etc. Stretch to the back simulating a large blitz line.

Special Considerations

  • Access issues for apparatus
  • Water supply location and challenges
  • Forcible Entry
  • Floor plan challenges
  • Rear and remote access points
  • Utilities
  • Friction loss and flow rates
  • Ventilation considerations
  • Occupancy type and demographics
  • First due resources
  • Construction type and associated challenges
  • Proficiency with deployment of dead or static loads
  • Get the permission of the property owner

Special note: If we cannot get into an apartment, we take the distance to the front door of the apartment and then measure the full length of the apartment from the exterior, approximating the interior stretch.

  continue reading

50 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide