Artwork

Content provided by Shop Talk. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Shop Talk or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Light at the end of the tunnel...

 
Share
 

Archived series ("Inactive feed" status)

When? This feed was archived on December 21, 2018 01:25 (6y ago). Last successful fetch was on October 30, 2018 21:37 (6y ago)

Why? Inactive feed status. Our servers were unable to retrieve a valid podcast feed for a sustained period.

What now? You might be able to find a more up-to-date version using the search function. This series will no longer be checked for updates. If you believe this to be in error, please check if the publisher's feed link below is valid and contact support to request the feed be restored or if you have any other concerns about this.

Manage episode 163446153 series 88580
Content provided by Shop Talk. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Shop Talk or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Michael Hammond goes underground to speak to two of the protagonists of the biggest construction project in Europe about the architectural and engineering challenges involved when building on such a massive scale When we describe Crossrail as a ‘big’ project, that’s something of an understatement. Now 75% complete, Crossrail, the UK’s largest ever rail infrastructure project, will comprise 42 km of new tunnels, 10 brand new stations and improvements to 30 other existing ones on the new Elizabeth Line. Once complete in 2019, a fleet of 66 trains of 200m long (that’s the length of two football pitches) will carry an estimated 200 million passengers a year. The route will run from Shenfield to the east of London to Reading to the west of the capital, also providing an all-important rail link to Heathrow Airport. The project will generate around 55,000 new jobs, 57,000 new homes, 3.25 million sq ft of new shops and offices, £42 billion for the UK economy, with a 10% increase to London’s rail capacity. With the approach of UK Construction Week (which opens today in Birmingham) Michael was keen to talk infrastructure. He was fortunate enough to get together with Julian Robinson, Head of Architecture at Crossrail, and Oliver Tyler, Partner at WilkinsonEyre – the architects responsible for the impressive design of the new Liverpool Street Station on the Elizabeth Line. For such a colossal project to be running on time and on budget is a Herculean achievement by anyone’s standards. Michael asks Julian what the secrets to the success story that is Crossrail are (the answer is in the podcast). And on a purely pragmatic level, Michael also enquires as to how all the construction materials and equipment are physically transported to their destination below the ground. In turn, Oliver discusses the way in which the various architects appointed to Crossrail have had to think ‘volume’ rather than ‘envelope’ when designing cathedral-like underground spaces with a ‘wow’ factor. Michael also asks how much individual expression versus corporate identity WilkinsonEyre has been allowed at Liverpool Street in terms of the architecture. It’s a very interesting reply, but you’ll have to tune in to the podcast to hear it!
  continue reading

20 episodes

Artwork
iconShare
 

Archived series ("Inactive feed" status)

When? This feed was archived on December 21, 2018 01:25 (6y ago). Last successful fetch was on October 30, 2018 21:37 (6y ago)

Why? Inactive feed status. Our servers were unable to retrieve a valid podcast feed for a sustained period.

What now? You might be able to find a more up-to-date version using the search function. This series will no longer be checked for updates. If you believe this to be in error, please check if the publisher's feed link below is valid and contact support to request the feed be restored or if you have any other concerns about this.

Manage episode 163446153 series 88580
Content provided by Shop Talk. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Shop Talk or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Michael Hammond goes underground to speak to two of the protagonists of the biggest construction project in Europe about the architectural and engineering challenges involved when building on such a massive scale When we describe Crossrail as a ‘big’ project, that’s something of an understatement. Now 75% complete, Crossrail, the UK’s largest ever rail infrastructure project, will comprise 42 km of new tunnels, 10 brand new stations and improvements to 30 other existing ones on the new Elizabeth Line. Once complete in 2019, a fleet of 66 trains of 200m long (that’s the length of two football pitches) will carry an estimated 200 million passengers a year. The route will run from Shenfield to the east of London to Reading to the west of the capital, also providing an all-important rail link to Heathrow Airport. The project will generate around 55,000 new jobs, 57,000 new homes, 3.25 million sq ft of new shops and offices, £42 billion for the UK economy, with a 10% increase to London’s rail capacity. With the approach of UK Construction Week (which opens today in Birmingham) Michael was keen to talk infrastructure. He was fortunate enough to get together with Julian Robinson, Head of Architecture at Crossrail, and Oliver Tyler, Partner at WilkinsonEyre – the architects responsible for the impressive design of the new Liverpool Street Station on the Elizabeth Line. For such a colossal project to be running on time and on budget is a Herculean achievement by anyone’s standards. Michael asks Julian what the secrets to the success story that is Crossrail are (the answer is in the podcast). And on a purely pragmatic level, Michael also enquires as to how all the construction materials and equipment are physically transported to their destination below the ground. In turn, Oliver discusses the way in which the various architects appointed to Crossrail have had to think ‘volume’ rather than ‘envelope’ when designing cathedral-like underground spaces with a ‘wow’ factor. Michael also asks how much individual expression versus corporate identity WilkinsonEyre has been allowed at Liverpool Street in terms of the architecture. It’s a very interesting reply, but you’ll have to tune in to the podcast to hear it!
  continue reading

20 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide