Artwork

Content provided by Peter Sumpton. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Peter Sumpton or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Digitising Temporary Works - Episode 34 | Ste Baldwin

24:11
 
Share
 

Manage episode 408941201 series 3505510
Content provided by Peter Sumpton. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Peter Sumpton or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

It’s easy, as humans, to focus on the end goal, what we set out to achieve and whether we’ve achieved this or fallen short. It’s the same in construction, be it remedial works or a new build there is always an end goal in mind.

It’s easy to forget the peripheral, the support functions, the necessary ones that will help achieve this end goal but will not be around to share in the glory. Take temporary works, for example, a critical lynchpin in any construction project and one that keeps us all safe and supported in the right areas at the right time.

But how safe and supported will we be going forward with more manual and traditional methods of design and implementation still being used? We’re about to find out.

Ste Baldwin has worked in the world of marketing for over 15 years including Education, Recruitment, Accountancy, Wholesale and Construction and Engineering, 6 of which have been as Head of Marketing and Comms within the Temporary Works sector of the construction industry prior to transferring to his current role as Category Marketing Manager - Below Ground at Mabey Hire he has spent the last 6 years within the engineering and service excellence space of temporary works.

Topics Covered

- Traditional methods of temporary works project design.

- Introducing to EVE.

- Is it worth a client's investment vs traditional methods?

- Transition from on-screen to on-site.

- Using VR.

- Future of technology within the temporary works industry.

Adobe Express 30-day Free Trial: https://prf.hn/l/ZYdd028

Website: https://www.builddifferent.marketing/

Further Links

https://www.mabeyhire.co.uk/technical-hub

https://www.mabeyhire.co.uk/about-us/eve

Mentioned in this episode:

Adobe Express 30-day Free Trial

Adobe Express 30-day Free Trial: https://prf.hn/l/ZYdd028

  continue reading

46 episodes

Artwork
iconShare
 
Manage episode 408941201 series 3505510
Content provided by Peter Sumpton. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Peter Sumpton or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://player.fm/legal.

It’s easy, as humans, to focus on the end goal, what we set out to achieve and whether we’ve achieved this or fallen short. It’s the same in construction, be it remedial works or a new build there is always an end goal in mind.

It’s easy to forget the peripheral, the support functions, the necessary ones that will help achieve this end goal but will not be around to share in the glory. Take temporary works, for example, a critical lynchpin in any construction project and one that keeps us all safe and supported in the right areas at the right time.

But how safe and supported will we be going forward with more manual and traditional methods of design and implementation still being used? We’re about to find out.

Ste Baldwin has worked in the world of marketing for over 15 years including Education, Recruitment, Accountancy, Wholesale and Construction and Engineering, 6 of which have been as Head of Marketing and Comms within the Temporary Works sector of the construction industry prior to transferring to his current role as Category Marketing Manager - Below Ground at Mabey Hire he has spent the last 6 years within the engineering and service excellence space of temporary works.

Topics Covered

- Traditional methods of temporary works project design.

- Introducing to EVE.

- Is it worth a client's investment vs traditional methods?

- Transition from on-screen to on-site.

- Using VR.

- Future of technology within the temporary works industry.

Adobe Express 30-day Free Trial: https://prf.hn/l/ZYdd028

Website: https://www.builddifferent.marketing/

Further Links

https://www.mabeyhire.co.uk/technical-hub

https://www.mabeyhire.co.uk/about-us/eve

Mentioned in this episode:

Adobe Express 30-day Free Trial

Adobe Express 30-day Free Trial: https://prf.hn/l/ZYdd028

  continue reading

46 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Quick Reference Guide